Portfolio

Zambia rural electrification

740 kW

Mwayukwayuka, Mwoshi and Chakua Matumbu

Client: Rural Electrification Authority (REA), Zambia

HydroDelft supported the development of three off-grid hybrid renewable energy projects in Mwayukwayuka, Mwoshi and Chakua Matumbu under an EU-funded rural electrification programme, with Turbulent as technology partner. The projects deliver a combined 740 kW, integrating micro-hydropower with solar PV to bring reliable, sustainable electricity to around 10,000 people in remote communities.

Back to Portfolio

740 kW

Installed capacity

10,000

People powered

€8M

Project value

3 sites

Off-grid communities

Our scope on the project

  • Site identification · locating viable off-grid sites across three communities

  • Hydrological assessments · measuring flow and head to confirm hydropower potential

  • Feasibility studies · testing the technical and commercial viability of each site

  • Technical design · engineering the hybrid micro-hydropower and solar PV systems

  • Environmental and social assessments · safeguarding communities and habitats

  • Financial analysis · building the numbers behind bankable projects

  • Project development support · guiding each project towards delivery

Technology and partners

Micro hydropower

500 kW of run-of-river generation providing steady baseload supply.

Solar PV

240 kW of solar complementing hydropower through daytime peaks.

Hybrid integration

Sources combined for reliable, round-the-clock power in remote areas.

Funded by the European Union · delivered with Turbulent (technology partner) for the Rural Electrification Authority (REA), Zambia.